Our Projects
Semper EnvironmentalBackground
Included is a description of a project that Semper Environmental has completed (or is working on). For all projects listed, Semper Environmental has worked in a subcontractor role, but our contribution in each project has been significant and often times has been in a project-lead capacity.
Our Role
Since our beginning in July 2017, Semper Environmental has partnered with numerous organizations and participated in several different projects. Our expert team can play several types of roles, and we contribute to every project in a variety of ways. Most often, our role is to lead and manage, offering guidance and professional expertise during every step of the process.
U.S. Army Tooele Army Depot —
South Area OB/OD Baseline Soil Concentrations
Environmental Site Investigation and Remediation
Semper was subcontracted by AQS, Inc. to determine baseline surface soil concentrations for a newly permitted Open Burn/Open Detonation (OB/OD) facility at the Tooele Army Depot—South Area, in Utah. Semper assisted in planning, including coordination and a site visit with environmental regulators, and was responsible for procuring and coordinating with an analytical laboratory. Semper Environmental developed the standard operating procedure and designed the sample units and decision units for the Incremental Sampling Method (ISM) that was used. Semper performed and managed the ISM field sampling and provided GIS mapping support and technical review for the Work Plan and Sampling Report. The project was completed with no issues and on time and within budget. The Army and AQS clients and the Utah Department of Environmental Quality (UDEQ) were very satisfied with the work and the results. The project established the background soil concentrations of organic and inorganic compounds which future soil sampling results will be compared to for this new Army OB/OD facility.